Starting the electrification of the fleet

Since May 22nd, we have installed in Oviedo (OVD) our first 80 V battery charger, until we have 2 units to provide service during the summer up to a maximum of 8 electric GSE equipment such as haulage tractor, conveyor belts or ladders.